Permits and architect
In Belgium, the rules depend on the Region, and works that need a permit must be designed and supervised by an architect. In Brussels, removing a load-bearing wall requires a planning permit (permis d’urbanisme) and an architect. In Wallonia, it normally requires a limited-impact planning permit (permis d’impact limité), with an architect. In Flanders, such interior works have been exempt from the omgevingsvergunning since 1 March 2026, provided that, since 5 September 2026, an architect is appointed to design and supervise them. In an apartment building, the wall is almost always a common part: the general meeting of co-owners must approve the works by a two-thirds majority.



